Shinfield Studio’s
Phase 2A & C – Stages 1,2,4,6,7 & 9
Site Details
Shinfield boasts 13 recently constructed sound stages, and an additional 5 are currently in the development phase. The entire studio complex, featuring a total of 18 stages, is scheduled to be fully operational by early 2024. All the stages are meticulously designed to meet the demands of film and TV production—spacious, adaptable areas with ample height, well-equipped with top-notch lighting gantries and the latest production tools.
Project Overview
Integrated Fire and Security Systems took pride in contributing to this prestigious project, delivering comprehensive services encompassing the design, installation, and commissioning of the fire alarm, VESDA, and WC alarm systems. The fire alarm system was meticulously crafted to adhere to an L1 system, aligning seamlessly with the BS5893-1 2017 regulations. The implementation featured 24 VESDA 4 pipe VEP panels, with a network of over 4800 meters of ASD pipework installed across the six stages.
Client
NG Bailey
Services
Fire Alarm System
VESDA ASD System
Disabled WC Alarm System